# Barrick Gold

> Barrick Gold's material transition starts with the mine site, where water, land, energy, reagents, tailings and closure are inseparable. Its 2025 reporting says the company exceeded an 80% water-recycling and reuse target, while its operating model uses site-level water plans and risk registers. The next useful unit is one mine and one material or water stream with a clear operating boundary.

- Industry: Metals & Mining
- Collection: Active
- Materials: Copper, Steel, Water
- Processes: Recycling, Mechanical processing
- Evidence through: 2026-09-18
- Canonical URL: https://www.materialtransition.com/library/barrick-gold

## Material inputs to resolve

Gold and copper mining with site-specific water, tailings, biodiversity and closure obligations

Barrick's 2025 Sustainability Report describes water stewardship, biodiversity management, climate resilience and site-level environmental planning. Barrick reports an overall water recycling and reuse rate of 81% in 2025, above its 80% annual target, and says each mine has a site-specific water management plan with water risks included in operational risk registers. Public reporting does not establish one mine-level material ledger connecting ore, reagents, water, tailings, recovery and closure outcome.

**81%** 2025 overall water recycling and reuse rate

**80%** Annual water recycling and reuse target exceeded

**17 countries** Barrick operations and projects across five continents

**Site-specific** Water management plans and operational risk registers

- Ore, water, energy, explosives, cyanide, grinding media, fuel, steel and maintenance materials
- Mine geology, processing plant, tailings storage, transport and closure planning
- Recovered metals, tailings, waste rock, process water and site rehabilitation inputs

### Outputs and residuals to resolve

- Gold, copper and mineral concentrates for downstream refining
- Tailings, waste rock, process water, reagents and closure materials
- Mine-level material balance, water quality and closure outcome remain open

**First decision:** Choose one Barrick mine and one stream, such as process water, reagents, tailings or steel. Map input, recovery, risk control, destination and closure implication.

## Water signal

Barrick reports an 81% overall water recycling and reuse rate in 2025, above its 80% target.

#### Governance signal

Barrick says each mine has a site-specific water management plan and operational risk register.

#### Material system

Mining operations connect ore, reagents, energy, water, tailings and closure in one physical system.

#### Evidence boundary

Group metrics do not establish one mine-level mass balance, water-quality result or closure pathway.

### Decision boundary

The public record supports one bounded next move: Choose one Barrick mine and one stream, such as process water, reagents, tailings or steel. Map input, recovery, risk control, destination and closure implication. It does not establish a buyer, commercial approval or supply agreement.

## Material flow map

| Material or stream | Qualification gate | Process or destination | Evidence still needed |
|-|-|-|-|
| Process water | Source, quality, reuse, discharge and watershed risk | Mine and processing plant loop | Volume, chemistry, reuse and discharge boundary |
| Ore and reagents | Grade, recovery, reagent use and hazardous-material controls | Crushing, grinding and recovery | Input, yield, residuals and product allocation |
| Tailings and waste rock | Stability, chemistry, containment and closure use | Tailings storage or rehabilitation | Volume, risk, route and closure evidence |

This is a public screening map. It separates company-disclosed flows from open qualification work. It does not convert a destination into a buyer or an announced ambition into operating capacity.

## Three defensible entry lanes

#### Make water performance site-specific

The group number is a signal. The operating decision lives at a mine, a watershed and a process.

**Next evidence:** Select mine, watershed, process, baseline, reuse project and result.

#### Connect recovery yield to material demand

More metal per tonne of ore changes the water, energy and tailings picture only when the boundary is explicit.

**Next evidence:** Join ore, recovery, reagents, energy, water, concentrate and residuals.

#### Design closure into today's material choices

Closure is not a final chapter. It changes what materials, routes and controls make sense now.

**Next evidence:** Select mine, material, tailings or waste stream, closure use and verification.

## Evidence register

- **2025 Sustainability Report release** Barrick Mining Corporation, official report announcement https://www.barrick.com/English/news/news-details/2026/2025-sustainability-report/default.aspx [1]
- **Environment** Barrick Mining Corporation, official environment hub https://www.barrick.com/English/sustainability/environment/default.aspx [2]
- **Sustainability Report 2025** Barrick Mining Corporation, official report PDF https://s25.q4cdn.com/322814910/files/doc\_downloads/sustainability/Barrick\_Sustainability\_Report\_2025.pdf [3]

Source hierarchy: filings and company disclosures first. The brief states what those sources support and leaves the unresolved plant, grade, permit, buyer and mass-balance questions explicit.

## Material Transition editorial interpretation

The next useful working session starts with: Choose one Barrick mine and one stream, such as process water, reagents, tailings or steel. Map input, recovery, risk control, destination and closure implication.

## Sources

- [1] 2025 Sustainability Report release - https://www.barrick.com/English/news/news-details/2026/2025-sustainability-report/default.aspx
- [2] Environment - https://www.barrick.com/English/sustainability/environment/default.aspx
- [3] Sustainability Report 2025 - https://s25.q4cdn.com/322814910/files/doc_downloads/sustainability/Barrick_Sustainability_Report_2025.pdf

From the Material Transition company brief library: https://www.materialtransition.com/library/barrick-gold
