Key facts
- Company
- AVR
- Industry
- Waste & Resource Recovery
- Processes
- Recycling, Incineration, Energy recovery
- Regions
- Europe
- Countries
- Netherlands
- Evidence through
- Sources
- 3 public sources
Energy recovery and material recovery are separate outputs
AVR processes residual waste to produce electricity and heat. Bottom ash is a separate downstream stream from which metals and mineral fractions may be recovered. Do not count electricity as recycled material or infer finished-product quality from a general recovery description.
Rozenburg’s recovery timeline affects comparisons
AVR’s 2025 annual-report update says capacity was gradually restored after the 2023 fire and that total energy output remained below pre-fire levels. A new turbine was expected in 2026. Compare current results with dated plant and line status, not a pre-fire nameplate baseline.
Bottom-ash products need current site evidence
Historical AVR reporting discusses metal extraction and controlled use of mineral fractions. Current tonnes, assays, residues, permits and receiving destinations were not established by the materials reviewed. Ask for a period-matched mass balance and customer receipts before treating an ash fraction as a secondary material.
Material Transition editorial interpretation
Select Rozenburg or Duiven and obtain the current permit, monthly accepted waste by source/category, incineration-line availability, net electricity and heat exported, bottom-ash weight and chemistry, ferrous/non-ferrous grades and weights, mineral-product specification and authorized end use, washing/sludge residues, downstream receipts, and contracted versus open lots. Verify 2026 turbine commissioning before counting incremental energy output.
Sources
- [1] AVR Annual Report 2025 update (opens in a new tab)
avr.nl
Official 2025 report summary states Rozenburg capacity recovery, restarted processing lines, energy output below pre-fire levels and a turbine expected in 2026. It supports current operating context, not material-product quantities.
- [2] AVR 2023 annual report: bottom ash discussion (opens in a new tab)
avr.nl
Official historical report describes bottom ash as metals and minerals, metal recovery and controlled mineral use. Historic process discussion only; not current yields or specifications.
- [3] AVR 2025 annual-report overview (opens in a new tab)
avr.nl
Official report overview confirms operational recovery and forward-looking turbine commissioning; the turbine remains a planned 2026 event in this cited summary.