Barrick Gold

Barrick Gold's material transition starts with the mine site, where water, land, energy, reagents, tailings and closure are inseparable. Its 2025 reporting says the company exceeded an 80% water-recycling and reuse target, while its operating model uses site-level water plans and risk registers. The next useful unit is one mine and one material or water stream with a clear operating boundary.

Industry
Metals & Mining
Evidence through
Sources
3 public

Key facts

Company
Barrick Gold
Industry
Metals & Mining
Materials
Copper, Steel, Water
Processes
Recycling, Mechanical processing
Evidence through

Material inputs to resolve

Gold and copper mining with site-specific water, tailings, biodiversity and closure obligations

Barrick's 2025 Sustainability Report describes water stewardship, biodiversity management, climate resilience and site-level environmental planning. Barrick reports an overall water recycling and reuse rate of 81% in 2025, above its 80% annual target, and says each mine has a site-specific water management plan with water risks included in operational risk registers. Public reporting does not establish one mine-level material ledger connecting ore, reagents, water, tailings, recovery and closure outcome.

81% 2025 overall water recycling and reuse rate

80% Annual water recycling and reuse target exceeded

17 countries Barrick operations and projects across five continents

Site-specific Water management plans and operational risk registers

  • Ore, water, energy, explosives, cyanide, grinding media, fuel, steel and maintenance materials
  • Mine geology, processing plant, tailings storage, transport and closure planning
  • Recovered metals, tailings, waste rock, process water and site rehabilitation inputs

Outputs and residuals to resolve

  • Gold, copper and mineral concentrates for downstream refining
  • Tailings, waste rock, process water, reagents and closure materials
  • Mine-level material balance, water quality and closure outcome remain open

First decision: Choose one Barrick mine and one stream, such as process water, reagents, tailings or steel. Map input, recovery, risk control, destination and closure implication.

Water signal

Barrick reports an 81% overall water recycling and reuse rate in 2025, above its 80% target.

Governance signal

Barrick says each mine has a site-specific water management plan and operational risk register.

Material system

Mining operations connect ore, reagents, energy, water, tailings and closure in one physical system.

Evidence boundary

Group metrics do not establish one mine-level mass balance, water-quality result or closure pathway.

Decision boundary

The public record supports one bounded next move: Choose one Barrick mine and one stream, such as process water, reagents, tailings or steel. Map input, recovery, risk control, destination and closure implication. It does not establish a buyer, commercial approval or supply agreement.

Material flow map

Material or streamQualification gateProcess or destinationEvidence still needed
Process waterSource, quality, reuse, discharge and watershed riskMine and processing plant loopVolume, chemistry, reuse and discharge boundary
Ore and reagentsGrade, recovery, reagent use and hazardous-material controlsCrushing, grinding and recoveryInput, yield, residuals and product allocation
Tailings and waste rockStability, chemistry, containment and closure useTailings storage or rehabilitationVolume, risk, route and closure evidence

This is a public screening map. It separates company-disclosed flows from open qualification work. It does not convert a destination into a buyer or an announced ambition into operating capacity.

Three defensible entry lanes

Make water performance site-specific

The group number is a signal. The operating decision lives at a mine, a watershed and a process.

Next evidence: Select mine, watershed, process, baseline, reuse project and result.

Connect recovery yield to material demand

More metal per tonne of ore changes the water, energy and tailings picture only when the boundary is explicit.

Next evidence: Join ore, recovery, reagents, energy, water, concentrate and residuals.

Design closure into today's material choices

Closure is not a final chapter. It changes what materials, routes and controls make sense now.

Next evidence: Select mine, material, tailings or waste stream, closure use and verification.

Evidence register

Source hierarchy: filings and company disclosures first. The brief states what those sources support and leaves the unresolved plant, grade, permit, buyer and mass-balance questions explicit.

Material Transition editorial interpretation

The next useful working session starts with: Choose one Barrick mine and one stream, such as process water, reagents, tailings or steel. Map input, recovery, risk control, destination and closure implication.

Sources

  1. [1]
  2. [2]
  3. [3]

Topics in this brief