Key facts
- Company
- Antony Waste Handling Cell Limited
- Industry
- Waste & Resource Recovery
- Materials
- Plastics
- Processes
- Recycling, Sorting, Incineration, Energy recovery
- Regions
- Asia
- Countries
- India
- Evidence through
- Sources
- 3 public sources
FY2025 portfolio throughput has a clear reporting period
The integrated annual report says Antony’s group managed 4.93 million metric tonnes of waste in FY2024 to 25 across collection and transportation and processing. This is a group portfolio throughput figure, not recovered-material tonnage, a single-site input figure or saleable inventory. Keep the reporting year and company boundary attached whenever using it.
PCMC combines power generation and plastic processing
The company reports that its Pimpri-Chinchwad WtE plant completed its first full commercial year, averaging an 82% plant-load factor and delivering over 90 million green units to the grid. The annual report separately says the PCMC project registered for EPR credits through plastic-processing operations. Electricity output and EPR-registered processing do not disclose polymer output, quality or ownership; these need a facility-level balance.
Do not infer a commodity from the incinerator residue
The public material reviewed does not provide a current PCMC ash assay, recovery yield, beneficial-use approval or contracted buyer. Ash recovery is therefore not presented as an established Antony product lane. It remains a diligence question, alongside the documented but unquantified plastic-processing stream.
Material Transition editorial interpretation
Request a PCMC line diagram and 12-month mass balance that separately reports incoming waste, removed recyclables, plastic-processing input and output, RDF or other residual fuel, bottom ash, fly ash, rejects and electricity. Confirm the legal operator, EPR registration boundary, material ownership, test methods, permits, polymer grade, contamination, monthly quantity and existing offtake obligations. Do not describe ash as a recovered product unless a facility-specific specification and buyer pathway are documented.
Sources
- [1] Antony Waste Integrated Annual Report 2024 to 25 (opens in a new tab)
antony-waste.com
Company annual report reports 4.93 million metric tonnes managed across the portfolio, PCMC’s first full year, 82% PLF, over 90 million green units and EPR registration through plastic processing. These are distinct metrics and flows.
- [2] Antony Waste waste-to-energy project overview (opens in a new tab)
antony-waste.com
Official company page describes the PCMC project as 1,000 tonnes/day input design and 14 MW, and says it uses recycled water. Design capacity is not actual throughput. The annual report is used for FY2025 operating evidence.
- [3] Antony Waste operational highlights as of June 2026 (opens in a new tab)
antony-waste.com
Official homepage labels its scale figures as of June 2026 and distinguishes cumulative waste processed since project inception from annual handling. These later cumulative measures are intentionally not combined with FY2025 group throughput.
Topics in this brief